IMPACT CALCULATOR
Calculate your workforce cost savings
Enter your organization details to see exactly how much bench waste, preventable attrition, and slow staffing decisions are costing you — and how much Siwaan can recover.
Enter Organization Inputs
Total Organization Headcount (FTEs)250 Engineers
502,000
Current Bench Rate (%)18%
5%40%
Average Annual Fully Loaded Cost per Resource (USD)$140k
$80k$250k
Annual Attrition Rate (%)22%
5%40%
ESTIMATED RECOVERABLE LOSSANNUAL RETRIEVABLE
Total Est. Annual Savings
$3.99M
Recovered Bench Capacity$2.65M
Assumes 42% average bench time reduction through semantic project matching.
Avoided Turnover & Attrition$1.35M
Assumes 35% preventable departures via early SHAP risk alerting.
Staffing Process Time Saved500 hrs
Reduced search overhead using natural language staffing shortlists.
* Savings are modeled based on average outcomes across mid-size IT consulting customers during their first 90 days. Individual results vary based on baseline metric performance.
Request Custom ROI Breakdown PDF Methodology Insights
- Replacement cost calculated at 50% of annual fully-loaded cost (recruiting + ramp).
- Bench recovery assumes average decrease in bench duration from 22% down to 9%.